Week IV renovation – this week has started some carpentry works – the bar counter and kitchen cabinets are installed. The contractor also started to install L-box, lay flooring with laminate at study room, install those copper pipings, bathroom accessories, toilet bowls, taps & basins, rain shower set, hand spray tap etc. at bathrooms. Aircon also done the re-trunking, existing parquet flooring are resand and revarnished. Doctor  ...